Wongm's Rail Gallery » Adelaide stations and infrastructure

Adelaide stations and infrastructure

Photos of railway infrastructure around the TransAdelaide network in suburban Adelaide - stations, signals, and such

Disconnected section of track opposite the goods shed at Blackwood

July 13, 2015 08:06 AM
Viewed 229 times
(2 times this week, 6 times this month)

'Blackwood Yard Limit' sign at the up end of the station

July 13, 2015 08:05 AM
Viewed 205 times
(4 times this month)

ETCS Level 1 balises at the end of a crossing loop on the Belair suburban line

July 13, 2015 07:59 AM
Viewed 299 times
(6 times this month)

Mural on the signal box at Mitcham station

July 13, 2015 07:56 AM
Viewed 362 times
(1 time this week, 3 times this month)

'EMU 15 on x-over' sign on the Seaford line at Goodwood

Apparently A-City EMUs are only permitted to travel at 15 km/h through selected crossovers due to the intercarriage connections coming into contact - sets 4007 and up were built to a new design, with the older sets still to be retrofitted.

July 13, 2015 07:52 AM
Viewed 226 times
(2 times this week, 6 times this month)

'TSR start 50 km/h' sign on the Seaford line

July 13, 2015 07:51 AM
Viewed 241 times
(4 times this week, 5 times this month)

'TSR start 50 km/h' sign on the Seaford line

July 13, 2015 07:51 AM
Viewed 233 times
(2 times this month)

'60 km/h ahead' sign on the Seaford line

July 13, 2015 07:51 AM
Viewed 230 times
(1 time this week, 2 times this month)

APT balises on the suburban tracks at Adelaide Showgrounds station

July 13, 2015 07:51 AM
Viewed 258 times
(1 time this week, 3 times this month)

Grounding jumper connecting an overhead stanchion to nearby metalwork on the platform

July 12, 2015 12:46 PM
Viewed 354 times
(4 times this month)

ETCS Level 1 balises in place along the electrified Seaford line

July 12, 2015 12:45 PM
Viewed 252 times
(2 times this week, 3 times this month)

Concrete slab track used through the Goodwood Junction rail underpass

July 12, 2015 12:45 PM
Viewed 267 times
(5 times this month)

3000 and 4000 class trains featured in a mural on the Seaford line

July 12, 2015 12:28 PM
Viewed 228 times
(7 times this month)

Secure bike cage at Hallett Cove Beach station

July 12, 2015 12:15 PM
Viewed 255 times
(2 times this week, 7 times this month)

Timber poles provide an insulated gap in the metal fencing around the electrified Seaford line rail corridor

The sign reads 'Insulation panel: do not connect to continuous fencing'

July 12, 2015 12:12 PM
Viewed 280 times
(6 times this month)

Prefabricated concrete platform sections used at Christie Downs station

July 12, 2015 12:09 PM
Viewed 243 times
(5 times this month)

Looking east over the Onkaparinga River from the railway viaduct

July 12, 2015 12:05 PM
Viewed 209 times
(2 times this week, 3 times this month)

PIDS on the platform at Seaford

July 12, 2015 12:00 PM
Viewed 244 times
(2 times this week, 5 times this month)

City end of Seaford station with two crossovers providing access to both platforms

July 12, 2015 11:59 AM
Viewed 246 times
(1 time this week, 3 times this month)

End of the line at Seaford station

July 12, 2015 11:58 AM
Viewed 296 times
(1 time this week, 5 times this month)

Tonsley line now electrified and partially double tracked

July 12, 2015 11:19 AM
Viewed 298 times
(1 time this month)

Track Sectioning Cabin at Ascot Park

Part of the 25kV AC overhead electrification system on the Seaford line

July 12, 2015 11:19 AM
Viewed 467 times
(2 times this week, 8 times this month)

Dual contact wire overhead in the platforms at Adelaide Railway Station

July 12, 2015 10:48 AM
Viewed 267 times
(1 time this week, 4 times this month)
Tags

Viewed 3538 times (2 times this week, 55 times this month)