Wongm's Rail Gallery » Ballarat line infrastructure

Ballarat line infrastructure

Photos of Ballarat station - a lot more are on my other site, Rail Geelong

Sprinter train features in a mural on the goods shed at Beaufort station

January 25, 2016 14:16 PM
Viewed 223 times
(6 times this month)

Reopened level crossing at Avenue Road in Burrumbeet

The level crossing was closed back in the 1990s with the opening of the Ballarat Bypass, then reopened in 2015 to allow the Avenue of Honour to continue north as a continuous road.

January 25, 2016 14:03 PM
Viewed 312 times
(6 times this month)

Two clocks at Ballarat station - neither on the correct time!

January 25, 2016 13:48 PM
Viewed 163 times
(4 times this month)

Disused Bathgate indicator on Ballarat platform 1

January 25, 2016 13:44 PM
Viewed 266 times
(8 times this month)

Coach terminal at Ballarat station

January 25, 2016 13:43 PM
Viewed 228 times
(6 times this month)

Lydiard Street crossing gates start to open at Ballarat station

January 16, 2016 13:35 PM
Viewed 184 times
(13 times this month)

Altered cutting towards Bank Box Loop - the eastern side has been cut back a massive amount

August 29, 2010 14:40 PM
Viewed 679 times
(8 times this month)

Fairy grass piled up around the fences beside Parwan Loop

August 29, 2010 12:40 PM
Viewed 1128 times
(11 times this month)

Fairy grass blown across the paddocks towards the line at Parwan Loop

August 15, 2010 16:52 PM
Viewed 825 times
(22 times this month)

Temporary fencing in place at Parwan Loop in an attempt to control the fairy grass

August 15, 2010 16:52 PM
Viewed 809 times
(8 times this month)

Freight Australia liveried curtainsider trailer at the Ballarat goods yard

January 18, 2009 13:14 PM
Viewed 794 times
(9 times this month)

Work on the new Wendouree station in Ballarat - platform underway

September 06, 2008 15:26 PM
Viewed 686 times
(1 time this week, 9 times this month)

Work on the new Wendouree station in Ballarat - main line slewed from the worksite

September 06, 2008 15:26 PM
Viewed 742 times
(6 times this month)

Stabled grain hoppers at the up end of the Ballarat goods yard

September 06, 2008 14:30 PM
Viewed 834 times
(9 times this month)

Loaded container wagons waiting for the Mildura freight to pass through

May 24, 2008 17:14 PM
Viewed 803 times
(8 times this month)

Y119 stabled at Ballarat, loaded container wagons either side

May 24, 2008 17:09 PM
Viewed 786 times
(9 times this month)

Y119 stabled at Ballarat with container wagons, a ballast train alongside

May 24, 2008 17:08 PM
Viewed 982 times
(13 times this month)

Empty container wagons beside grain hoppers in the Ballarat goods yard

May 24, 2008 17:07 PM
Viewed 846 times
(11 times this month)

Disused signal at the down end of Ballarat

May 24, 2008 16:55 PM
Viewed 756 times
(7 times this month)

Lydiard Street gates and Ballarat station from the west

May 24, 2008 16:54 PM
Viewed 889 times
(11 times this month)

Preserved semaphore signals at the down end of Ballarat station

May 24, 2008 16:30 PM
Viewed 819 times
(11 times this month)

Lydiard Street crossing gates at Ballarat

May 24, 2008 11:30 AM
Viewed 846 times
(11 times this month)

Point rodding from Ballarat B signal box

May 24, 2008 11:29 AM
Viewed 1566 times
(16 times this month)
Tags

Viewed 3866 times (1 time this week, 3 times this month)