Wongm's Rail Gallery » Ballarat line infrastructure

Ballarat line infrastructure

Photos of Ballarat station - a lot more are on my other site, Rail Geelong

Reopened level crossing at Avenue Road in Burrumbeet

The level crossing was closed back in the 1990s with the opening of the Ballarat Bypass, then reopened in 2015 to allow the Avenue of Honour to continue north as a continuous road.

January 25, 2016 14:03 PM

Coach terminal at Ballarat station

January 25, 2016 13:43 PM

Viewed 3525 times (8 times this week, 30 times this month)