Wongm's Rail Gallery » Infrastructure Evaluation Vehicle IEV102 transfer, January 2017

Infrastructure Evaluation Vehicle IEV102 transfer, January 2017

Metro Trains Melbourne's Infrastructure Evaluation Vehicle IEV102 developed a brake issue in December 2016, with the T-IEV-T consist having having to be transferred back to Melbourne behind B76 and B80. In January IEV102 was transferred to Bendigo behind B76 and B80, with six freight wagons (BODX 2301C, BQCX 2202B, BQIX 2461D, IEV 102, BQCX 2201P, BQIX 2459V and BODX 2460V) along for the ride to counteract the unbraked carriage.

B80 and B76 waiting on the goods lines at Sunshine for a path north

January 05, 2017 08:04 AM
Viewed 58 times
(1 time this week, 7 times this month)

B80 leads B76, three freight wagons, IEV102 and three more freight wagons north through Sunshine

January 05, 2017 08:11 AM
Viewed 70 times
(1 time this week, 8 times this month)

IEV102 marshalled with three freight wagons either side

January 05, 2017 08:11 AM
Viewed 67 times
(1 time this week, 8 times this month)

IEV102 marshalled with three freight wagons either side

January 05, 2017 08:11 AM
Viewed 61 times
(7 times this month)
Tags

Viewed 193 times (2 times this week, 20 times this month)