Wongm's Rail Gallery » Furlong Main level crossing removal project

Signalling cable relocation works in preparation for the Main Road grade separation works at St Albans

In album: Furlong Main level crossing removal project

Signalling cable relocation works in preparation for the Main Road grade separation works at St Albans

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Friday 20 March 2015 08:24 AM
Exposure Time: 1/250 sec
Aperture Value: f/7.1
Viewed 1730 times
(1 time this week, 2 times this month, 2 times this year)