Wongm's Rail Gallery » Furlong Main level crossing removal project

Temporary insulated protection for the overhead passing under the Ruth Street footbridge

In album: Furlong Main level crossing removal project

Temporary insulated protection for the overhead passing under the Ruth Street footbridge

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Tuesday 10 January 2017 16:21 PM
Exposure Time: 1/800 sec
Aperture Value: f/13
Viewed 703 times
(1 time this week, 3 times this month, 5 times this year)