Wongm's Rail Gallery » Furlong Main level crossing removal project

Drainage pipes waiting to be installed in rail corridor north of St Albans

In album: Furlong Main level crossing removal project

Drainage pipes waiting to be installed in rail corridor north of St Albans

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Wednesday 8 March 2017 20:50 PM
Exposure Time: 1/160 sec
Aperture Value: f/6.3
Viewed 497 times
(1 time this week, 1 time this month, 1 time this year)