Wongm's Rail Gallery » Furlong Main level crossing removal project

Excavators at work installing drainage pits between the running lines north of St Albans

In album: Furlong Main level crossing removal project

Excavators at work installing drainage pits between the running lines north of St Albans

View full sized (1280px by 1920px)

Taken with a Canon EOS 7D
Date: Wednesday 8 March 2017 20:54 PM
Exposure Time: 1/50 sec
Aperture Value: f/4
Viewed 513 times
(1 time this week, 1 time this month, 3 times this year)