Wongm's Rail Gallery » Furlong Main level crossing removal project

Furlong Main level crossing removal project

In 2014 work commenced on the grade separation of the Main Road level crossing at St Albans station, with the Ginifer Road level crossing at Ginifer station later being added to the project scope.

Crane getting ready to move the PSO pod at St Albans station, as part of the grade separation works

September 12, 2015 22:57 PM
Viewed 303 times
(3 times this week, 14 times this month)

SPOT monitor at the up end of St Albans platform 3 still powered up, despite the lack of track

September 12, 2015 22:52 PM
Viewed 231 times
(1 time this week, 7 times this month)

PSO pod at St Albans station ready to be relocated, as part of the grade separation works

September 12, 2015 22:49 PM
Viewed 204 times
(1 time this week, 8 times this month)

St Albans platform 3 minus track and overhead

St Albans now has two active platforms and two inactive ones: the former platform 1 at the down end, and dock platform 3.

September 12, 2015 22:47 PM
Viewed 290 times
(6 times this month)

PSO pod at St Albans station ready to be relocated, as part of the grade separation works

September 12, 2015 22:46 PM
Viewed 226 times
(1 time this week, 8 times this month)

New stanchions at St Albans station, in the lead up to the grade separation works

September 12, 2015 22:46 PM
Viewed 232 times
(7 times this month)

Signalling cable relocation works in preparation for the Main Road grade separation works at St Albans

March 20, 2015 08:28 AM
Viewed 303 times
(5 times this week, 9 times this month)
Tags

Viewed 2358 times (24 times this week)