Wongm's Rail Gallery » Metro Tunnel early works at South Kensington

McLeod Rail staff upgrading sidings at North Dynon

In album: Metro Tunnel early works at South Kensington

High voltage transmission lines are in the way of the western tunnel portal, so they're being moved to the other side of the tracks, where these sidings are in the way
McLeod Rail staff upgrading sidings at North Dynon

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: Wednesday 22 March 2017 12:17 PM
Exposure Time: 1/400 sec
Aperture Value: f/8
Viewed 714 times
(2 times this week, 3 times this month, 1 time this year)