Wongm's Rail Gallery » 707 Operations - Steam and Streamliner, August 2018

Signaller at Berwick ready to operate the crossover at the down end of the station

In album: 707 Operations - Steam and Streamliner, August 2018

Signaller at Berwick ready to operate the crossover at the down end of the station

View full sized (683px by 1024px)

Taken with a Canon EOS 7D
Date: 26 August 2018 11:05 AM
Exposure Time: 1/500 sec
Aperture Value: f/9
Viewed 442 times
(3 times this week, 4 times this month, 31 times this year)