Wongm's Rail Gallery » Abbotts Road level crossing removal project

Excavation works underway on the south-east side of the railway

In album: Abbotts Road level crossing removal project

Excavation works underway on the south-east side of the railway

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Saturday 13 January 2018 11:58 AM
Exposure Time: 1/800 sec
Aperture Value: f/9
Viewed 769 times
(1 time this week, 2 times this month, 5 times this year)