Wongm's Rail Gallery » Abbotts Road level crossing removal project

Pylons in place at the up end of the level crossing

In album: Abbotts Road level crossing removal project

Pylons in place at the up end of the level crossing

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 14 July 2018 11:29 AM
Exposure Time: 1/500 sec
Aperture Value: f/9
Viewed 512 times
(1 time this week, 1 time this month, 46 times this year)