Wongm's Rail Gallery » Adelaide stations and infrastructure

Adelaide stations and infrastructure

Photos of railway infrastructure around the TransAdelaide network in suburban Adelaide - stations, signals, and such

'Blackwood Yard Limit' sign at the up end of the station

July 13, 2015 08:05 AM
Viewed 284 times
(1 time this week, 1 time this month)

Mural on the signal box at Mitcham station

July 13, 2015 07:56 AM
Viewed 519 times
(1 time this week, 1 time this month)

'EMU 15 on x-over' sign on the Seaford line at Goodwood

Apparently A-City EMUs are only permitted to travel at 15 km/h through selected crossovers due to the intercarriage connections coming into contact - sets 4007 and up were built to a new design, with the older sets still to be retrofitted.

July 13, 2015 07:52 AM
Viewed 315 times
(1 time this week, 1 time this month)

'TSR start 50 km/h' sign on the Seaford line

July 13, 2015 07:51 AM
Viewed 316 times

'TSR start 50 km/h' sign on the Seaford line

July 13, 2015 07:51 AM
Viewed 304 times
(1 time this week)

'60 km/h ahead' sign on the Seaford line

July 13, 2015 07:51 AM
Viewed 302 times

Grounding jumper connecting an overhead stanchion to nearby metalwork on the platform

July 12, 2015 12:46 PM
Viewed 453 times
(1 time this week)

ETCS Level 1 balises in place along the electrified Seaford line

July 12, 2015 12:45 PM
Viewed 352 times
(2 times this week, 2 times this month)

Concrete slab track used through the Goodwood Junction rail underpass

July 12, 2015 12:45 PM
Viewed 373 times
(1 time this week)

'Caution more than one train' sign illuminated at a level crossing outside Emerson station

July 12, 2015 12:41 PM
Viewed 341 times
(2 times this week, 1 time this month)

Secure bike cage at Hallett Cove Beach station

July 12, 2015 12:15 PM
Viewed 362 times

Timber poles provide an insulated gap in the metal fencing around the electrified Seaford line rail corridor

The sign reads 'Insulation panel: do not connect to continuous fencing'

July 12, 2015 12:12 PM
Viewed 401 times

Looking east over the Onkaparinga River from the railway viaduct

July 12, 2015 12:05 PM
Viewed 274 times
(1 time this week, 1 time this month)

PIDS on the platform at Seaford

July 12, 2015 12:00 PM
Viewed 323 times

End of the line at Seaford station

July 12, 2015 11:58 AM
Viewed 393 times
(1 time this week, 1 time this month)

Tonsley line now electrified and partially double tracked

July 12, 2015 11:19 AM
Viewed 431 times
(1 time this week)

Track Sectioning Cabin at Ascot Park

Part of the 25kV AC overhead electrification system on the Seaford line

July 12, 2015 11:19 AM
Viewed 755 times
Tags

Viewed 4125 times (4 times this week, 32 times this month)