Wongm's Rail Gallery » ARTC trackwork

ARTC trackwork

Trackwork on the Australian Rail Track Corporation network, that stretches across the country

ARTC hi-rail heads north on the standard gauge at McIntyre Loop

6 January 2021 11:11 AM
Viewed 7 times
(1 time this week, 7 times this month, 7 times this year)

Temporary fishplate on the dual gauge track at Middle Footscray

2 January 2021 13:49 PM
Viewed 11 times
(11 times this month, 11 times this year)

ARTC hi-rail heads over the Tottenham Triangle

9 December 2020 10:41 AM
Viewed 33 times
(3 times this week, 9 times this month, 33 times this year)

'11.7 km' mark at a hi-rail access point at Sunshine

7 November 2020 13:49 PM
Viewed 31 times
(2 times this week, 5 times this month, 31 times this year)

New ballast on the standard gauge at Sunshine, but the trackside drainage is still clogged

29 October 2020 14:43 PM
Viewed 63 times
(7 times this month, 63 times this year)

Mudhole in the ARTC tracks at Sunshine

16 October 2020 13:44 PM
Viewed 60 times
(2 times this week, 12 times this month, 60 times this year)

Hi-rails at work down in the Bunbury Street Tunnel

21 June 2020 07:18 AM
Viewed 142 times
(1 time this week, 18 times this month, 142 times this year)

ARTC hi-rail excavator tamping the ballast on the standard gauge at Sunshine

12 February 2020 08:22 AM
Viewed 142 times
(3 times this week, 2 times this month, 142 times this year)

Fresh ballast on the goods lines at Middle Footscray

4 December 2019 08:04 AM
Viewed 145 times
(1 time this week, 1 time this month, 21 times this year)

ARTC signal fitters at a level crossing in Dimboola

4 October 2019 13:44 PM
Viewed 149 times
(3 times this week, 1 time this month, 34 times this year)

ARTC signal fitters at Tailem Bend

4 October 2019 10:08 AM
Viewed 138 times
(2 times this week, 1 time this month, 36 times this year)

Harsco ballast tampers and regulator stabled at Mile End Loop

4 October 2019 07:18 AM
Viewed 164 times
(1 time this week, 43 times this year)

Track protection supervisor stands guard while the native grasslands at Sunshine are checked

4 July 2019 08:28 AM
Viewed 203 times
(1 time this week, 77 times this year)

New lengths of rail in place along the goods lines at Middle Footscray

10 April 2019 14:40 PM
Viewed 202 times
(1 time this week, 11 times this month, 100 times this year)

ARTC staff work on the tracks at Tottenham Loop

10 December 2018 08:37 AM
Viewed 190 times
(6 times this month, 11 times this year)

John Holland staff work on the signalling at West Footscray Junction

6 December 2018 09:04 AM
Viewed 272 times, 17 times this year)

Alignment of the future Ararat standard gauge triangle

27 November 2018 12:27 PM
Viewed 290 times
(1 time this week, 1 time this month, 15 times this year)

Pile of old signals in the depot at Ararat

27 November 2018 11:16 AM
Viewed 222 times
(2 times this week, 1 time this month, 18 times this year)

Excavators and front end loaders between jobs at Ararat

27 November 2018 11:15 AM
Viewed 224 times
(2 times this week, 2 times this month, 17 times this year)

Concrete sleepered diamond crossing ready to be installed as part of the future Ararat standard gauge triangle

27 November 2018 11:15 AM
Viewed 357 times
(1 time this week, 1 time this month, 19 times this year)

Testing that the level crossing protection is operating on the Western SG near Ararat

27 November 2018 11:10 AM
Viewed 254 times
(1 time this week, 1 time this month, 15 times this year)

Inspecting the tracks on the Geelong Grain Loop

27 November 2018 09:17 AM
Viewed 227 times
(1 time this week, 1 time this month, 18 times this year)

Hi-rail excavators between jobs at Dock Link Road at Dynon

27 November 2018 08:15 AM
Viewed 230 times
(2 times this week, 1 time this month, 19 times this year)

Hi-rail excavators between jobs at Dock Link Road at Dynon

27 November 2018 08:15 AM
Viewed 231 times, 18 times this year)
Tags

Viewed 1520 times (2 times this week, 1 time this month, 535 times this year)