Wongm's Rail Gallery » ARTC trackwork

Goods lines at West Footscray: the north (main) line was resleepered in concrete some time ago, the timber sleepered south line has just had the mud holes fixed

In album: ARTC trackwork

Goods lines at West Footscray: the north (main) line was resleepered in concrete some time ago, the timber sleepered south line has just had the mud holes fixed

View full sized (1024px by 683px)

Taken with a Canon EOS 50D
Date: Wednesday 22 September 2010 14:10 PM
Exposure Time: 1/500 sec
Aperture Value: f/10
Viewed 1265 times
(1 time this week, 1 time this month, 2 times this year)
1 vote from 1 view