Wongm's Rail Gallery » ARTC trackwork

Work completed on the north track, now the south track is being relaid through the Bunbury Street tunnel

In album: ARTC trackwork

Work completed on the north track, now the south track is being relaid through the Bunbury Street tunnel

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 9 June 2021 13:45 PM
Exposure Time: 1/80 sec
Aperture Value: f/6.3
Viewed 215 times
(1 time this week, 2 times this month, 31 times this year)