Wongm's Rail Gallery » Ballarat line infrastructure

Ballarat line infrastructure

Photos of Ballarat station - a lot more are on my other site, Rail Geelong

Semaphore signals and a complete signal box in a backyard in Bacchus Marsh

19 August 2018 10:18 AM
Viewed 405 times
(3 times this week, 9 times this month, 72 times this year)

Sprinter train features in a mural on the goods shed at Beaufort station

25 January 2016 14:16 PM
Viewed 539 times
(2 times this week, 6 times this month, 113 times this year)

Reopened level crossing at Avenue Road in Burrumbeet

The level crossing was closed back in the 1990s with the opening of the Ballarat Bypass, then reopened in 2015 to allow the Avenue of Honour to continue north as a continuous road.

25 January 2016 14:03 PM
Viewed 712 times
(8 times this month, 94 times this year)

Two clocks at Ballarat station - neither on the correct time!

25 January 2016 13:48 PM
Viewed 471 times
(4 times this month, 73 times this year)

Disused Bathgate indicator on Ballarat platform 1

25 January 2016 13:44 PM
Viewed 628 times
(7 times this month, 124 times this year)

Coach terminal at Ballarat station

25 January 2016 13:43 PM
Viewed 905 times
(10 times this month, 449 times this year)

Lydiard Street crossing gates start to open at Ballarat station

16 January 2016 13:35 PM
Viewed 606 times
(6 times this week, 13 times this month, 120 times this year)

Altered cutting towards Bank Box Loop - the eastern side has been cut back a massive amount

29 August 2010 14:40 PM
Viewed 954 times
(1 time this week, 10 times this month, 76 times this year)

Fairy grass piled up around the fences beside Parwan Loop

29 August 2010 12:40 PM
Viewed 1423 times
(5 times this month, 60 times this year)

Fairy grass blown across the paddocks towards the line at Parwan Loop

15 August 2010 16:52 PM
Viewed 1113 times
(3 times this month, 70 times this year)

Temporary fencing in place at Parwan Loop in an attempt to control the fairy grass

15 August 2010 16:52 PM
Viewed 1218 times
(5 times this month, 64 times this year)

Fairy grass covering the track at Parwan Loop, disrupting the operation of track circuits, resulting in a 60 km/h speed restriction

15 August 2010 16:51 PM
Viewed 1271 times
(1 time this week, 8 times this month, 106 times this year)

Work on the new Wendouree station in Ballarat - platform underway

6 September 2008 15:26 PM
Viewed 970 times
(5 times this month, 68 times this year)

Work on the new Wendouree station in Ballarat - main line slewed from the worksite

6 September 2008 15:26 PM
Viewed 1006 times
(1 time this week, 8 times this month, 67 times this year)

Disused signal at the down end of Ballarat

24 May 2008 16:55 PM
Viewed 1021 times
(5 times this month, 63 times this year)

Lydiard Street gates and Ballarat station from the west

24 May 2008 16:54 PM
Viewed 1171 times
(5 times this month, 65 times this year)

Preserved semaphore signals at the down end of Ballarat station

24 May 2008 16:30 PM
Viewed 1145 times
(2 times this week, 6 times this month, 70 times this year)

Lydiard Street crossing gates at Ballarat

24 May 2008 11:30 AM
Viewed 1129 times
(6 times this month, 66 times this year)

Point rodding from Ballarat B signal box

24 May 2008 11:29 AM
Viewed 2051 times
(7 times this month, 126 times this year)

Lydiard Street crossing gates at Ballarat

24 May 2008 11:29 AM
Viewed 1428 times
(1 time this week, 6 times this month, 72 times this year)

Station clocktower

8 December 2007 19:39 PM
Viewed 884 times
(1 time this week, 5 times this month, 63 times this year)

Ballan signal box

22 December 2005 15:25 PM
Viewed 679 times
(5 times this month, 82 times this year)

Bacchus Marsh signal box

22 December 2005 15:04 PM
Viewed 800 times
(4 times this month, 93 times this year)
Tags

Viewed 4905 times (4 times this week, 11 times this month, 316 times this year)