Wongm's Rail Gallery » Blackburn Road level crossing removal project

Piling works underway on both sides of the track east of Blackburn Road

In album: Blackburn Road level crossing removal project

Piling works underway on both sides of the track east of Blackburn Road

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 18 May 2016 07:42 AM
Exposure Time: 1/200 sec
Aperture Value: f/4
Viewed 643 times
(1 time this week, 4 times this month, 36 times this year)