Wongm's Rail Gallery » Blackburn Road level crossing removal project

Piling works underway at the down end of the Blackburn Road level crossing

In album: Blackburn Road level crossing removal project

 Piling works underway at the down end of the Blackburn Road level crossing

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 12 July 2016 07:39 AM
Exposure Time: 1/200 sec
Aperture Value: f/10
Viewed 424 times
(3 times this week, 7 times this month, 65 times this year)