Wongm's Rail Gallery » Blackburn Road level crossing removal project

Work continues on new lift, ramps and stairs to link the subway to the southern side of the station

In album: Blackburn Road level crossing removal project

Work continues on new lift, ramps and stairs to link the subway to the southern side of the station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Saturday 3 June 2017 19:31 PM
Exposure Time: 1/30 sec
Aperture Value: f/4
Viewed 775 times
(1 time this week, 2 times this month, 53 times this year)