Wongm's Rail Gallery » Carrum level crossing removal project

Mainline track slewed so the station and yard can be demolished, piling rig at work on the future elevated track

In album: Carrum level crossing removal project

Mainline track slewed so the station and yard can be demolished, piling rig at work on the future elevated track

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Sunday 11 August 2019 15:23 PM
Exposure Time: 1/800 sec
Aperture Value: f/7.1
Viewed 622 times
(1 time this week, 1 time this month, 28 times this year)