Wongm's Rail Gallery » Caulfield - Dandenong level crossing removal project

Crash deck in place at the down end of Murrumbeena station

In album: Caulfield - Dandenong level crossing removal project

Permitting the gantry cranes to work above, while trains move below
Crash deck in place at the down end of Murrumbeena station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 13 March 2018 15:16 PM
Exposure Time: 1/500 sec
Aperture Value: f/10
Viewed 264 times
(1 time this week, 6 times this month, 111 times this year)