Wongm's Rail Gallery » City Loop

Fine welded mesh covers the top of the draft relief shaft

In album: City Loop

The vertical shaft ends about 13 metres below the surface, where another tunnel heads sideways towards the underground draught relief structure
Fine welded mesh covers the top of the draft relief shaft

View full sized (1024px by 683px)

Taken with a Canon EOS 50D
Date: 20 July 2011 08:59 AM
Exposure Time: 1/60 sec
Aperture Value: f/5.6
Viewed 2129 times
(4 times this week, 9 times this month, 131 times this year)