High Capacity Corridor Upgrade project

The High Capacity Corridor Upgrade project (previously the Cranbourne Pakenham Line Upgrade project) is being delivered by the Level Crossing Removal Authority to support the new High Capacity Metro Train (HCMT) fleet. The work includes track duplication on the Cranbourne line at Dandenong South, minor platform extensions, and the replacement of signalling, overhead wires and traction substations along the Cranbourne and Pakenham railway lines.

Massive concrete foundation waiting to be used on the Frankston line side of the tracks at Armadale

Friday 11 November 2022 15:47 PM
Viewed 17 times
(4 times this week, 17 times this month, 17 times this year)

Trackside Radio Assembly on the Frankston line side of the tracks at Armadale

Friday 11 November 2022 15:47 PM
Viewed 20 times
(5 times this week, 20 times this month, 20 times this year)

Assembling new turnouts on timber sleepers at the Malvern goods yard site compound

Friday 11 November 2022 15:46 PM
Viewed 13 times
(3 times this week, 13 times this month, 13 times this year)

Random concrete and steel cage at the up end of Caulfield station

Friday 11 November 2022 15:45 PM
Viewed 8 times
(2 times this week, 8 times this month, 8 times this year)

Excavator at a worksite at the former works platform at Caulfield

Friday 11 November 2022 15:43 PM
Viewed 8 times
(2 times this week, 8 times this month, 8 times this year)

Signal DNG706 at the down end of Dandenong platform 3

Friday 11 November 2022 15:13 PM
Viewed 16 times
(2 times this week, 16 times this month, 16 times this year)

Platform extension at the down end of Dandenong platform 3

Friday 11 November 2022 15:12 PM
Viewed 11 times
(1 time this week, 11 times this month, 11 times this year)

Buffer light DNG722 at the down end of the Dandenong works siding

Friday 11 November 2022 15:07 PM
Viewed 12 times
(2 times this week, 12 times this month, 12 times this year)

Pair of loaded semi trailers depart the Dandenong South site compound

Friday 11 November 2022 13:11 PM
Viewed 13 times
(1 time this week, 13 times this month, 13 times this year)

Franna crane loading a semi-trailer at the Dandenong South site compound

Friday 11 November 2022 12:35 PM
Viewed 9 times
(1 time this week, 9 times this month, 9 times this year)

Unused concrete pad for a signal equipment room on the up side of Sandown Park

Possibly part of the descoped High Capacity Signalling rollout to Dandenong, now terminating at Clayton

Friday 11 November 2022 10:44 AM
Viewed 8 times
(1 time this week, 8 times this month, 8 times this year)

Short staff-only platform extension at the up end of Westall platform 3

Friday 11 November 2022 10:39 AM
Viewed 4 times
(4 times this month, 4 times this year)

South-east end of the Huntingdale station car park used as a works compound

Friday 11 November 2022 10:35 AM
Viewed 5 times
(2 times this week, 5 times this month, 5 times this year)

'MTM Car Stop' sign at the up end of Huntingdale station

Friday 11 November 2022 10:34 AM
Viewed 4 times
(2 times this week, 4 times this month, 4 times this year)

Norming point NP6014 between the rails at South Yarra station

Friday 11 November 2022 10:17 AM
Viewed 7 times
(2 times this week, 7 times this month, 7 times this year)

Up end of Dandenong platform 2 and 3

Friday 25 February 2022 21:47 PM
Viewed 85 times
(1 time this month, 85 times this year)

Platform extension at the down end of Dandenong platform 3

Friday 25 February 2022 21:44 PM
Viewed 78 times
(3 times this month, 78 times this year)

Working on the new signal equipment room at the down end of Caulfield

Tuesday 15 February 2022 11:56 AM
Viewed 67 times, 67 times this year)

Two different extensions at the up end of Westall platform 2

Concrete and steel added as part of the 2010 upgrade, and a second one for the HCMT rollout

Tuesday 15 February 2022 11:31 AM
Viewed 72 times, 72 times this year)

Short staff-only platform extension at the down end of Westall platform 3

Tuesday 15 February 2022 11:07 AM
Viewed 105 times
(1 time this week, 1 time this month, 105 times this year)

Foundations and cable runs for a future signal equipment room at the down end of Westall

Tuesday 15 February 2022 10:31 AM
Viewed 75 times, 75 times this year)

Massive gantry supports the Trackside Radio Assembly halfway up the cutting wall at South Yarra

Tuesday 1 February 2022 12:06 PM
Viewed 103 times
(1 time this month, 103 times this year)

Massive gantry supports the Trackside Radio Assembly halfway down the embankment wall at Hawksburn

Tuesday 1 February 2022 12:06 PM
Viewed 97 times
(2 times this month, 97 times this year)

Staff only platform extensions at the up end of Hawksburn platform 3 and 4

Tuesday 1 February 2022 11:58 AM
Viewed 108 times
(2 times this month, 108 times this year)