Wongm's Rail Gallery » High Capacity Corridor Upgrade project

New overhead stanchions in place at Oakleigh, with new lengths of rail stockpiled between the tracks

In album: High Capacity Corridor Upgrade project

New overhead stanchions in place at Oakleigh, with new lengths of rail stockpiled between the tracks

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 13 March 2018 13:19 PM
Exposure Time: 1/500 sec
Aperture Value: f/14
Viewed 640 times
(3 times this week, 13 times this month, 191 times this year)