Wongm's Rail Gallery » High Capacity Corridor Upgrade project

New overhead stanchions in place at Oakleigh, with new lengths of rail stockpiled between the tracks

In album: High Capacity Corridor Upgrade project

New overhead stanchions in place at Oakleigh, with new lengths of rail stockpiled between the tracks

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Tuesday 13 March 2018 13:23 PM
Exposure Time: 1/400 sec
Aperture Value: f/14
Viewed 761 times
(1 time this week, 1 time this month, 1 time this year)