Wongm's Rail Gallery » High Capacity Corridor Upgrade project

Installing new signal conduits at the down end of Oakleigh station

In album: High Capacity Corridor Upgrade project

Installing new signal conduits at the down end of Oakleigh station

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 24 May 2018 09:43 AM
Exposure Time: 1/1250 sec
Aperture Value: f/4
Viewed 317 times
(1 time this week, 10 times this month, 107 times this year)