Wongm's Rail Gallery » High Capacity Corridor Upgrade project

New tilt mast signals awaiting commissioning at the down end of Oakleigh station

In album: High Capacity Corridor Upgrade project

New tilt mast signals awaiting commissioning at the down end of Oakleigh station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 24 May 2018 13:26 PM
Exposure Time: 1/160 sec
Aperture Value: f/7.1
Viewed 280 times
(1 time this week, 7 times this month, 39 times this year)