Wongm's Rail Gallery » High Capacity Corridor Upgrade project

Piling works for new stanchion along the Dandenong line tracks at Richmond

In album: High Capacity Corridor Upgrade project

Piling works for new stanchion along the Dandenong line tracks at Richmond

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 5 January 2019 18:05 PM
Exposure Time: 1/320 sec
Aperture Value: f/9
Viewed 185 times
(1 time this week, 1 time this month, 67 times this year)