Wongm's Rail Gallery » High Capacity Corridor Upgrade project

Excavators at work at the down end of Richmond

In album: High Capacity Corridor Upgrade project

Excavators at work at the down end of Richmond

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: January 05, 2019 18:05 PM
Exposure Time: 1/320 sec
Aperture Value: f/8
Viewed 93 times
(2 times this week, 5 times this month, 93 times this year)