Wongm's Rail Gallery » High Capacity Corridor Upgrade project

Excavators at work at the down end of Richmond

In album: High Capacity Corridor Upgrade project

Excavators at work at the down end of Richmond

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 5 January 2019 18:05 PM
Exposure Time: 1/320 sec
Aperture Value: f/8
Viewed 161 times
(1 time this week, 4 times this month, 48 times this year)