Wongm's Rail Gallery » High Capacity Corridor Upgrade project

Signal D124 relocated at the north end of South Yarra platform 5

In album: High Capacity Corridor Upgrade project

Signal D124 relocated at the north end of South Yarra platform 5

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 1 August 2019 13:30 PM
Exposure Time: 1/250 sec
Aperture Value: f/7.1
Viewed 102 times
(1 time this week, 6 times this month, 102 times this year)