Wongm's Rail Gallery » High Capacity Corridor Upgrade project

Additional traction power feeders above the Dandenong tracks at South Yarra

In album: High Capacity Corridor Upgrade project

Additional traction power feeders above the Dandenong tracks at South Yarra

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 11 December 2020 19:43 PM
Exposure Time: 1/100 sec
Aperture Value: f/5.6
Viewed 85 times
(1 time this week, 13 times this month, 85 times this year)