Wongm's Rail Gallery » High Capacity Corridor Upgrade project

Trackside Radio Assembly affixed to signals along the 'Skyrail' viaduct

In album: High Capacity Corridor Upgrade project

2.4 Ghz radio antennas that are part of the new communications-based train control (CBTC) system
Trackside Radio Assembly affixed to signals along the 'Skyrail' viaduct

View full sized (1280px by 1920px)

Taken with a Canon EOS 7D
Date: Thursday 29 July 2021 12:52 PM
Exposure Time: 1/1000 sec
Aperture Value: f/16
Viewed 262 times
(1 time this week, 1 time this month, 37 times this year)