Wongm's Rail Gallery » High Capacity Corridor Upgrade project

Fixed mast Trackside Radio Assembly at Toorak

In album: High Capacity Corridor Upgrade project

Fixed mast Trackside Radio Assembly at Toorak

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Tuesday 23 November 2021 14:32 PM
Exposure Time: 1/640 sec
Aperture Value: f/18
Viewed 213 times
(1 time this week, 2 times this month, 12 times this year)