Wongm's Rail Gallery » High Capacity Corridor Upgrade project

Portable gazebo protects the signalling staff working on a equipment box at Caulfield

In album: High Capacity Corridor Upgrade project

Portable gazebo protects the signalling staff working on a equipment box at Caulfield

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Tuesday 7 December 2021 14:25 PM
Exposure Time: 1/400 sec
Aperture Value: f/11
Viewed 117 times
(1 time this week, 1 time this month, 7 times this year)