Wongm's Rail Gallery » High Capacity Corridor Upgrade project

TrackLink III beacon fitted between the rails on the approach to South Yarra platform 5

In album: High Capacity Corridor Upgrade project

TrackLink III beacon fitted between the rails on the approach to South Yarra platform 5

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Tuesday 1 February 2022 09:36 AM
Exposure Time: 1/640 sec
Aperture Value: f/8
Viewed 205 times
(1 time this week, 8 times this month, 15 times this year)