Wongm's Rail Gallery » High Capacity Corridor Upgrade project

Tilt mast Trackside Radio Assembly between the running lines at South Yarra

In album: High Capacity Corridor Upgrade project

Tilt mast Trackside Radio Assembly between the running lines at South Yarra

View full sized (1280px by 1920px)

Taken with a Canon EOS 7D
Date: Tuesday 1 February 2022 09:41 AM
Exposure Time: 1/640 sec
Aperture Value: f/11
Viewed 218 times
(2 times this week, 6 times this month, 10 times this year)