Wongm's Rail Gallery » Elizabeth Street tram works

Now installing curves between the lengths of conduit

In album: Elizabeth Street tram works

Now installing curves between the lengths of conduit

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 5 October 2013 21:19 PM
Exposure Time: 1/80 sec
Aperture Value: f/6.3
Viewed 492 times
(1 time this week, 2 times this month, 44 times this year)