Wongm's Rail Gallery » Failing rail infrastructure of Melbourne

Resurfaced roadway already breaking up at the Park Street level crossing in Moonee Ponds

In album: Failing rail infrastructure of Melbourne

Resurfaced roadway already breaking up at the Park Street level crossing in Moonee Ponds

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 3 April 2015 10:57 AM
Exposure Time: 1/400 sec
Aperture Value: f/14
Viewed 767 times
(3 times this week, 10 times this month, 78 times this year)