Wongm's Rail Gallery » Failing rail infrastructure of Melbourne

Inconsistent platform heights mean a step up OUT of the train at Camberwell station

In album: Failing rail infrastructure of Melbourne

Inconsistent platform heights mean a step up OUT of the train at Camberwell station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Friday 13 May 2016 18:27 PM
Exposure Time: 1/100 sec
Aperture Value: f/4
Viewed 728 times
(1 time this week, 2 times this month, 2 times this year)