Wongm's Rail Gallery » Failing rail infrastructure of Melbourne

Steel rod reinforces cracked archways at Camberwell platform 3

In album: Failing rail infrastructure of Melbourne

Steel rod reinforces cracked archways at Camberwell platform 3

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Friday 12 August 2016 08:45 AM
Exposure Time: 1/50 sec
Aperture Value: f/4.5
Viewed 863 times
(1 time this week, 2 times this month, 3 times this year)