Wongm's Rail Gallery » Failing rail infrastructure of Melbourne

Overhead stanchion with a disconnected grounding jumper

In album: Failing rail infrastructure of Melbourne

Overhead stanchion with a disconnected grounding jumper

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 1 February 2017 15:22 PM
Exposure Time: 1/500 sec
Aperture Value: f/8
Viewed 489 times
(3 times this week, 5 times this month, 37 times this year)