Wongm's Rail Gallery » Failing rail infrastructure of Melbourne

Palm tree growing in the trackside drain on the Flinders Street Viaduct

In album: Failing rail infrastructure of Melbourne

Palm tree growing in the trackside drain on the Flinders Street Viaduct

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 23 March 2021 08:55 AM
Exposure Time: 1/250 sec
Aperture Value: f/7.1
Viewed 193 times
(1 time this week, 5 times this month, 60 times this year)