Wongm's Rail Gallery » Failing rail infrastructure of Melbourne

Failing rail infrastructure of Melbourne

Melbourne's railway network is held together with bubblegum and duct tape - here are examples of the way that it is falling apart.

Another temporary fishplate bolted to a flawed rail

22 November 2011 08:40 AM
Viewed 1257 times
(1 time this week, 3 times this month, 71 times this year)

Temporary fishplate bolted to a flawed rail

22 November 2011 08:40 AM
Viewed 864 times
(2 times this week, 6 times this month, 87 times this year)

Temporary fishplates bolted to flawed rail at Ascot Vale

22 November 2011 08:40 AM
Viewed 1082 times
(2 times this week, 15 times this month, 98 times this year)

Weeds between the tracks at Ascot Vale, dying off for summer

29 October 2011 13:33 PM
Viewed 751 times
(1 time this week, 8 times this month, 57 times this year)

Flooded subway at Ascot Vale: is it really that hard to maintain drains?

17 February 2011 08:39 AM
Viewed 1340 times
(15 times this month, 101 times this year)

Interface between Metro and V/Line track underneath the signals at Franklin Street

Note the grass covered bit of non-electrified suburban track that Metro is supposed to be maintaining

13 February 2011 08:09 AM
Viewed 935 times
(5 times this month, 64 times this year)

'Temporary' timber supports on the down platform verandah at Kensington - it has been like this for months now...

16 May 2010 08:49 AM
Viewed 932 times
(1 time this week, 7 times this month, 85 times this year)

They cover over the top of the new Footscray footbridge, but use perforated panels that let water through?

11 April 2010 09:53 AM
Viewed 1289 times
(7 times this week, 13 times this month, 106 times this year)

Reinforcement bars exposed in the piers of the Hampshire Road bridge at Sunshine

10 April 2010 08:27 AM
Viewed 740 times
(4 times this month, 56 times this year)

Reinforcement bars exposed in the piers of the Hampshire Road bridge at Sunshine

10 April 2010 08:27 AM
Viewed 812 times
(6 times this month, 61 times this year)

Reinforcement bars exposed in the piers of the Hampshire Road bridge at Sunshine

10 April 2010 08:27 AM
Viewed 776 times
(4 times this month, 51 times this year)

That can't be good - cracked up concrete piers of the Hampshire Road bridge at Sunshine

10 April 2010 08:26 AM
Viewed 889 times
(7 times this month, 106 times this year)

Weeds growing between the tracks at Glenferrie

31 March 2010 17:27 PM
Viewed 765 times
(2 times this week, 11 times this month, 69 times this year)

Wet, wet, wet at North Melbourne - the 'roof' is useless...

8 December 2009 08:53 AM
Viewed 1255 times
(12 times this month, 95 times this year)

50 km/h speed restriction for the disused oil siding at Paisley - the points are falling apart

24 November 2009 08:36 AM
Viewed 906 times
(1 time this week, 6 times this month, 74 times this year)

The new next train display at Flinders Street Station are already faulty...

27 March 2007 08:10 AM
Viewed 1052 times
(1 time this week, 6 times this month, 93 times this year)

The new next train display at Flinders Street Station are already faulty...

27 March 2007 08:07 AM
Viewed 1350 times
(1 time this week, 7 times this month, 106 times this year)

Temporary fix for a damaged rail at Glenferrie Station

21 November 2006 12:25 PM
Viewed 836 times
(1 time this week, 5 times this month, 68 times this year)

Cracked rail head at Glenferrie

29 June 2006 11:34 AM
Viewed 804 times
(2 times this month, 51 times this year)

Cracked rail head at Glenferrie

29 June 2006 11:34 AM
Viewed 831 times
(6 times this month, 70 times this year)

Crap track outside Spencer Street - a giant mud hole

11 May 2006 15:46 PM
Viewed 1001 times
(3 times this week, 8 times this month, 79 times this year)
Tags

Viewed 3623 times (4 times this week, 12 times this month, 593 times this year)