Wongm's Rail Gallery » Glenroy Road level crossing removal project

Steps up to the temporary footbridge at Glenroy

In album: Glenroy Road level crossing removal project

Provides access to platform 1 while the rail cutting is constructed on the east side
Steps up to the temporary footbridge at Glenroy

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 29 July 2021 11:06 AM
Exposure Time: 1/250 sec
Aperture Value: f/11
Viewed 34 times
(1 time this week, 2 times this month, 34 times this year)