Wongm's Rail Gallery » High Capacity Metro Train testing on the Belgrave line

P18 leads T385 on the down transfer through Burnley

In album: High Capacity Metro Train testing on the Belgrave line

P18 leads T385 on the down transfer through Burnley

View full sized (1024px by 683px)

Taken with a Canon EOS 7D
Date: 13 March 2020 00:34 AM
Exposure Time: 1/160 sec
Aperture Value: f/4
Viewed 187 times
(3 times this week, 4 times this month, 57 times this year)