Wongm's Rail Gallery » High Capacity Metro Train testing on the Belgrave line

HCMT set heads onto the single line at Ferntree Gully station

In album: High Capacity Metro Train testing on the Belgrave line

HCMT set heads onto the single line at Ferntree Gully station

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 13 March 2020 01:33 AM
Exposure Time: 1/200 sec
Aperture Value: f/4
Viewed 221 times
(1 time this week, 5 times this month, 60 times this year)