Wongm's Rail Gallery » High Capacity Metro Train testing on the Sandringham line

HCMT set 3 passes through Windsor on the down, with another trip to Elsternwick

In album: High Capacity Metro Train testing on the Sandringham line

HCMT set 3 passes through Windsor on the down, with another trip to Elsternwick

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: Sunday 20 December 2020 15:06 PM
Exposure Time: 1/320 sec
Aperture Value: f/8
Viewed 373 times
(1 time this week, 4 times this month, 15 times this year)