Wongm's Rail Gallery » HCMT High Capacity Signalling testing at Epping

HCMT set 18 fired up at Epping Workshops, ready for another night of High Capacity Signalling testing

In album: HCMT High Capacity Signalling testing at Epping

HCMT set 18 fired up at Epping Workshops, ready for another night of High Capacity Signalling testing

View full sized (1920px by 1280px)

Taken with a Canon EOS 7D
Date: 25 October 2021 20:06 PM
Exposure Time: 1/80 sec
Aperture Value: f/4
Viewed 73 times
(11 times this week, 26 times this month, 73 times this year)